My Account Home
Global Marketplace for Asset Recovery & Surplus Inventory

Categories

Manufacturers

Upcoming Bids Due
All Listings > Metals > Scrap > Nonwovens Spunbound Fabric Manufacturing Production Lines - Fire-Damaged (3 Production Lines) FOR SCRAP

Nonwovens Spunbound Fabric Manufacturing Production Lines - Fire-Damaged (3 Production Lines) FOR SCRAP

Nonwovens Spunbound Fabric Manufacturing Production Lines - Fire-Damaged (3 Production Lines) FOR SCRAP
ATTENTION: This item is no longer available.
VIEW AVAILABLE ITEMS
Quantity: 3 Production Lines
Product Location: Saudi Arabia

Seller Description

These three Production Lines and Associated Ancillary Equipment were subjected to fire-damaged. Specifications are provided below:

PP1 Production Line 

  • Plant/ Equipment:   REICOFIL 4 SXMMS 3200 4 MF-Bico for the production of spunbonded nonwovens, with 2 spunbond and 2 meltblown beams, 3200 mm nominal width, with 3 roll calendar, humidifier, drum dryer and inder, rewinder, hybrid recycling system with die cleaning equipment.
  • Fabric Gross Width:  3.20 m
  • Installed capacity:  800 m/min
  • OEM: REIFENHAUSER GmbH & Co. KG, Germany
  • Contract Date: 19/05/2005
  • Commissioning Date: 2008
  • Condition: Considerably damaged; OEM recommends complete replacement

PET Production Line:

  • Plant/ Equipment:  Spunbonding Plant for the production of PES spunbond nonwoven fabrics to be used as Roofing carriers
  • Fabric Gross Width: 5.20 m
  • Production Capacity: up to 1310 kg/h
  • OEM: ORV Manufacturing S.p.A, Italy
  • Contract Date: 29/12/2006
  • Commissioning Date: 2011
  • Condition: Heavily damaged; OEM recommends complete replacement.

PP2 Production Line

  • Plant/ Equipment: REICOFIL 4 SSMMMS 4200 4 for the production of composite spunbonded nonwovens, with 3 spunbond and 3 meltblown beams, 4200 mm nominal width, with 3 roll twin calendar, humidifier, drum dryer and winding system.
  • Fabric Gross Width:  4.20 m
  • Installed Capacity: 1000 m/min
  • OEM: REIFENHAUSER GmbH & Co. KG, Germany
  • Contract Date:  30/11/2011
  • Commissioning Date: 2014
  • Condition:  Partially damaged; OEM says it is repairable but difficult.

Other Equipment: Other equipment installed at the facility include:

  • Electrical installations to support the three production lines,
  • HVAC equipment,
  • Fire suppression systems,
  • Ancillary equipment i.e. overhead gantry cranes, storage hoppers, packing systems etc., some of which are not affected and may or may not be available for sale.

 

Other Listings in Scrap

(0 bids)
5 Tons
null, Barbados
(1 bids)
1 Water Tank Truck
Africa
(7 bids)
690 Tonnes
null, Sweden
(2 bids)
1 Lowbed
Africa
(17 bids)
11 Water Tanks
Texas, United States
(1 bids)
3 Trucks
Africa
(2 bids)
2 Crane
Europe
End Date: Feb-24-20 09:15 AM CST
(2 bids)
3 Separator Shells
New Mexico, United States
VIEW ALL SCRAP LISTINGS (9)

Other Listings in Metals

(1 bids)
76 Cables
Texas, United States
(0 bids)
1000 FT
Texas, United States
End Date: Feb-21-20 09:00 AM CST
(0 bids)
24 Items
Ontario, Canada
(0 bids)
124712.5 Kg
Indonesia
(10 bids)
279.98 Metric Tons
Ecuador
(0 bids)
520 Kg
Russian Federation
(1 bids)
85344 Lbs
Portugal
(21 bids)
2 Reels
Ethiopia
(3 bids)
48104 ft.
Texas, United States
(65 bids)
270000 Ft
Oklahoma, United States
(2 bids)
2 Crane
Europe
End Date: Feb-24-20 09:15 AM CST
(2 bids)
1 Lowbed
Africa
(41 bids)
328.89 MT
Georgia, United States
(2 bids)
3 Separator Shells
New Mexico, United States
(1 bids)
3 Coils
Texas, United States
(2 bids)
1 Unit
Tunisia
(69 bids)
100 MT
Nigeria
(7 bids)
3847 Joints
null, Pakistan
VIEW ALL METALS LISTINGS (43)